
Is it time?
Some signs are obvious: boards that flex or feel spongy, a surface that's green and slippery all winter, screws popping up, rot at the board ends. Others are hidden. The frame might have been built straight onto soil, or joists might be sitting in water. Ask the professionals who quote about lifting a board or two during a visit to see what's really going on.

New boards or a new deck
If the joists are sound, level and at the right spacing, putting new boards on the old frame is often the best value. Composite needs closer joists than timber, so sometimes ask about adding extra joists between the old ones before re-boarding.
If the frame is soft, built on the soil, too close to the house's damp-proof course or simply the wrong shape for how you want to use the garden, ask about taking it all out and starting again. That's also the moment to fix the things that annoyed you about the old deck: steps that were too steep, a deck too small for a table, or a level that made the back door awkward.

What the job covers
Ask the professionals who quote to lift the old boards and frame, clear it away, check the ground and sort out drainage before building the new deck. Ask whether the old material can stay. They'll finish the new deck with fascias, steps and any guarding you need.
Swapping timber for composite
Most of the replacement decks ask about in Middlesbrough go from softwood to composite. The usual reason is simple: people are tired of cleaning and treating timber every year and want a deck they can just use.
Your questions
Can you replace just the boards and keep the frame?
Yes, if the frame is sound. Ask for every joist to be checked, for extra joists where the new boards need them, and for anything soft to be replaced.
Do you take the old deck away?
Yes. Removing and disposing of the old deck is included in the quote, so there's nothing left for you to deal with.



